This project is to be delivered to the MBTA under a Design-Build
Contract basis, and requires the CBB Team to furnish a complete
design of the project, to construct the project as designed
and to comply with the requirements of the Design-Build
Contract.
|
FREQUENTLY
ASKED QUESTIONS
|
- How
do identify CBB Workers
|
| |
| |
| |
| |
|
Have
questions not answered here? Ask
us.
|
|
|
Preliminary project designs prepared by the Jay Cashman,
Inc. / Balfour Beatty Const., Inc joint venture. The
following plans will depict initial layout designs
and represent the direction in which the project is
moving. As designs are further developed, this website
will be updated.
|
The MBTA provided a conceptual design (approximately 15%)
of the project to CBB as part of the RFP process. The MBTA
has also initiated the environmental permitting process,
which is to be finalized by the D-B Contractor as design
progresses.
The project will restore commuter rail service on the existing
right-of-way known as the Greenbush corridor through the
towns of Braintree, Weymouth, Hingham, Cohasset and Scituate,
Massachusetts. The project begins at the connection with
the existing MBTA Old Colony Main Line at the Braintree
Wye in East Braintree, and extends 18 miles easterly along
the former New Haven Railroad Greenbush Branch to the terminus
in the Greenbush section of Scituate. The project involves
the reconstruction of existing, largely out-of-service railroad
right-of-way as a single-track railroad with four controlled
passing sidings of approximately 1 mile in length each.
Once completed, the facility will be equipped with a new
signal and communications system and end-of-the-line train
layover facility. In addition, certain freight facilities
in Braintree will be relocated off-line.
The right-of-way is currently active for local freight
service on the first 1.5 miles in East Braintree. The remainder
of the right-of-way is either out of service or abandoned.
The proposed commuter rail service will provide twelve (12)
round trips between Boston-South Station and Greenbush each
weekday and eight (8) round trips on weekends. Scheduled
peak-direction one-way trip time between South Station and
Greenbush, including a stop at Quincy Center, will be 59
minutes.
Seven new commuter rail stations will be constructed along
the right-of-way, each with an 800-foot long high-level
platform. New commuter parking lots at the stations ranging
in size from 200 to 1000 spaces each will provide a total
of approximately 3000 spaces along the corridor. Stations
will be similar to those constructed on the other Old Colony
lines and will include accommodations for bicycle parking
and passenger drop-off/pick-up by automobile, van, or bus.
Nine existing single span railroad bridges will be reconstructed
with new ballast deck superstructures and new or rehabilitated
abutments and wing-walls. Work will be performed on two
existing roadway bridges over the right-of-way: one (1)
bridge will be replaced in its entirety and the other will
be repaired. Four (4) new grade separations will be constructed:
at Weymouth Landing (shallow cut tunnel); Green Street (new
railroad bridge over lowered roadway); Hingham Square (underpass
with 800 foot long cut and cover tunnel crossing under three
(3) roadways); and Rocky Lane (new highway bridge on new
roadway alignment crossing over the right-of-way).
Of the forty-three (43) existing roadway grade crossings
on the right-of-way, ten (10) will be closed and eight (8)
eliminated by grade separations. The remaining twenty-five
(25) crossings, plus one (1) new roadway crossing and three
(3) pedestrian crossings, will be reconstructed with new
grade crossing warning systems and supplemental safety measures
in accordance with the Swift Act. The entire facility will
be designated as a quiet zone (no routine use of train whistles
at crossings). Intersection improvements will be made at
locations immediately adjacent to the railroad and station
entrances and at seven (7) remote locations. At one (1)
location on Route 3A in Scituate, an existing signalized
intersection will be replaced with a combination of traffic
signals and a roundabout. New or modified traffic signals
will be installed at a total of nineteen (19) locations.
The project includes extensive mitigation measures to address
noise, vibration, historic, wetland, and other impacts.
Noise barriers will be constructed at six (6) locations,
vibration-dampening ballast mats will be installed under
a total of 3.5 miles of track, and screen plantings will
be installed along 6 miles of right of sidelines. Fencing,
consisting of chain link, security, black chain link, solid
wood, or steel picket, depending on location, will be provided
along virtually the entire length of the right-of-way. Mitigation
agreements have been reached with two (2) of the five (5)
Towns detailing specific mitigation items to be provided.
In accordance with the Section 106 Agreement Resource Consultations,
a Project Conservator will monitor the project to ensure
that historic properties are protected and mitigated as
agreed. An Independent Observer will monitor the Project
to ensure that wetlands are protected and mitigated in accordance
with certain environmental approvals. Additional mitigation
measures, such as noise abatement of individual homes, will
be performed by the MBTA independent of the D-B Contract.