Braintree Cut over Work
(Please click the image/title to view full size picture)

020 Arpril 28 2006 Grading for new switch 024 April 28 2006 Disassembling the turnout 058 April 28 2006 Picking up the turnout package 073 April 28 2006 Picking up the turnout package
April, 28 2006 Grading for new switch Disassembling the turnout Picking up the turnout package Picking up the turnout package
Sliding package into new location Ready to tie in to existing track Track for turnout Track gets shoved over to new position
Sliding package into new location April, 29 2006 Ready to tie in to existing track Track for turnout Track gets shoved over to new position
Tie replacement Ballasting operation at new location Moving rail to splice into new temporary location Continue ballast operation
Tie replacement April, 30 2006 Ballasting operation at new location Moving rail to splice into new temporary location Continue ballast operation
127 April 30 2006 Tie-ins complete Getting ready to gage track Gaging track prior to final alignment Hand spiking every 4th tie for gage Completed cutover track
Tie-ins complete Getting ready to gage track Gaging track prior to final alignment Hand spiking every 4th tie for gage Completed cutover track